Doka formwork assembly, Doka field service. The integral prop-locki Doka formwork assembly, Doka field service. The integral prop-locking device makes it possible to tilt User Information Circular formwork H20 999705002 - 03/2020 7 Services Support in every stage of the project Project success assured by products and services from a single source. It stands out for its excellent adaptability to all Formwork-sheet stop for panel assembly of the timber-beam formwork. All components must be Doka products and systems must be set up so that all loads acting upon them are safely transferred! Pouring Do not exceed the permitted fresh-concrete pres-sures. Factory pre-assembly of the formwork elements permits short forming-times, but requires longer lead-times for the design, planning and as-sembly work, as well as calling for very special care in transit. Any type of plywood can be used, so that any concrete Page 94 Wall formwork User Information Framed formwork Framax Xlife plus Framax pouring platform O 1. Use suitable tools such as timber wedges, special pry-bars or system In short: expert specialised formwork planning with lasting benefits for your bridge construction project. The combination of Xclimb 60 and a trapezoidal metal sheet enclosure is also a tried-and-tested safety solution on difficult structure geometries. All components must be stored safely, following all the special Doka instructions given in the relevant sections of this document! Maintenance Only original Doka components may be used as United Kingdom Doka UK Formwork Technologies Ltd Monchelsea Farm, Heath Road Boughton Monchelsea Maidstone, Kent, ME17 4JD Telephone: +44 1622 74 90 50 Telefax: +44 1622 74 90 33 E-Mail UK@doka. Large-panel frame formwork for walls, columns and elevator shafts. Doka offers more than formwork solutions for all areas of construction activity – for anything from housing developments to transportation For out-of-the-ordinary builds, the Doka Ready-to-Use Service supplies the jobsite with made-to-measure, pre-assembled formwork units. Doka Manuals offers the possibility to view product information and interesting documents on formwork systems at any time. Erect 3. Doka Connects With Contractors at CONEXPO 2023. Login; Contact. Doka planned a self-climbing formwork solution with 650 m² of made-to-measure Top 50 beam formwork. Assembly drawings created and approved by Doka provide you with detailed arrangement of individual parts for a selfassembled fixed formwork unit. The Formwork Experts. Stripping the formwork Do not strip out the formwork until the concrete has reached sufficient strength and the person in charge has given the order for the formwork to be stripped out! When stripping out the formwork, never use the crane to break concrete cohesion. B. Large-area formwork Top 50 ings anywhere in the range of travel of the scissor-action spindle. Instructions for assembly and use (Method statement) Setting up with tripod Applies only for use as free-standing props. B Doka beam H20 top 16’- 0” and 11’ - 6”. Navigate through the formwork systems to find the Assembly drawings. The fast floor-slab formwork for forming large areas: fast working, as less equipment is needed - 1/3 fewer floor props needed because of the Easy assembly and handling Note: The Column formwork Top 50 can be adapted for fresh-concrete pressures higher or lower than 90 kN/m². Two ties are needed in the first panel, and two in the last panel. 999746002 - 02/2014 en-GB. We focus on the technical challenges of formwork right from the design phase. 25 m wide, for convenient and safe working. on working platforms or in multi-trip packaging. On concrete floor-slabs Edge protection on floor-slab formwork Can be fastened anywhere on the formwork beam, in either the transverse or longitudinal direction. All components must be stored safely, following all the special Doka instructions given in the relevant sections of this document! Maintenance Only original Doka components may be used as Quick set-up. The illustrations in this brochure show the situation during formwork assembly and are therefore incomplete from the safety aspect. The assembly sequence is not included. The Doka offers a wide range of proven wall formwork systems for all jobsite situations, all fields of use, and all specifications regarding the concrete finish. DokaCAD for Revit is designed for all project types and provides access to more than 40,000 ‘tried-and-tested’ Assembly drawings created and approved by Doka provide you with detailed arrangement of individual parts for a selfassembled fixed formwork unit. Effective protection against dirt. pre-assembled table grille for facing with any desired form-ply; Dokamatic swiv­el-head 40 rigid restraint of floor prop for a 10 kN increase in load-bearing capacity With their field-proven 'top' quality, the Doka formwork sheets, 'H20 top' beams and 'Eurex top' props ensure reliability and a long service life. The flexurally rigid link Ed Rd. . The specially designed Doka Monolithic prop heads allow slab formwork to be removed User Information Alternative methods of assembly 999813002 - 12/2017 7 Operating with DekLift 4. A Tilt-back board Preparing the pouring platform: Tilt up the guard rails and lock them in position. One of the fundamental things our formwork systems are based on is their site-proven components. Doka offers formwork solutions for all areas of construction activity – for anything from housing developments to transportation infrastructure and power-generation facilities, or Doka products and systems must be set up so that all loads acting upon them are safely transferred! Pouring Do not exceed the permitted fresh-concrete pres-sures. A leader in concrete formwork and shoring systems. com The timber-beam floor formwork with particularly sturdy components reduces the number of items needed and is fast to erect and dismantle, resulting in savings in labour costs. Follow the directions in the 'Large-area form- When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. Global formwork specialist Doka has launched a new Revit plug-in for automated formwork planning. If necessary, mark the position of the first row of sheets with a chalk line. ErgonomiX. Doka is a reliable supplier of a rentable, modular all-in-one. When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. For side railings on Doka ready-to-use platforms, and as opposing guard-rail posts on Formwork elements FF20. Competent support from planning through to assem- bly directly on site. . Rego@doka. High performance, in all stages of the project When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. No. 78 Doka multi-trip packaging 80 Cleaning and care of your equipment 82 Product overview. Erfahren Sie mehr über die Vorteile, die Anwendungsbereiche und die technischen Daten der verschiedenen Doka-Systeme. All structural components can be integrated into a monolithic construction process. And specially When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. DOKA - The Formwork Experts. With more than 160 sales and logistics facilities in over 60 countries, Doka has a high-performing distribution network for advice, Doka Monolithic is designed for easy formwork stripping processes with vertical formwork able to be removed after 12 hours, or concrete strength of 2 N/mm² achieved, and horizontal formwork removed after 36 hours, or achieving a concrete strength of 10 N/mm². Page 31: Step 1. F Removable folding tripod. Using Doka formwork, contractors Hilti & Jehle achieved superb fair-faced concrete on this project to remodel the church forecourt and 4 999810202 - 02/2020 User Information Foundation formwork Frami Xlife Tying horizontal Xlife panels Top tie with Frami flat tie-rods and Frami clips Tie rod is held above panel (not in the concrete) Number of ties needed: *) In every other panel, only one tie is needed. All components must be stored safely, following all the special Doka instructions given in the relevant sections of this document! Maintenance Only original Doka components may be used as Solutions for your construction projects. approval, ease of assembly, operator safety and rapid availability. 4 999746002 - 07/2023 Introduction User Information Column formwork KS Xlife Instructions for Assembly and Use, Operating Instruction manuals, plans etc. Š by Doka GmbH, A-3300 Amstetten. Technical Information Can be used with following systems Column formwork Job Description · As a Pre-Assembly Operator you will are responsible for assigned formwork assembly requiring physical and hands-on tasks ensuring accuracy Climbing Formwork. through height adjustment by means of stacking holes as well as fine adjustment via the thread. 30 cm A Universal end-shutter support 30cm C Doka formwork sheet 3-SO D Spax screws 4x40 (fully threaded) E Doka beam Doka will be pleased to plan an economical form-work solution for you, and partial pre-assembly of the formwork by the Doka Ready-to-Use Service will save both man-hours and space on the site. This helps us ensure optimum performance of our website, in particular. User Information. Shop Doka. Doka offers formwork solutions for all areas of construction activity – for anything from housing developments to transportation infrastructure and power-generation facilities, or for building the world’s tallest structures. ) are up to date and Doka FRAMAX Xlife. Downloads. requirements in terms of planning, structural-design. 25/2. 979, Chennai - 600 089, INDIA. All components must be Buy Doka wall and floor formwork, components, accessories directly in the Online Store- quick and easy! Product description. C Lowering head H20. A Plywood. ) are up to date and In addition, the User Information booklets (Instructions for Assembly and Use), which contain information on standard system set-up and on compliant utilisation of Doka formwork systems, must also be observed. slab thickness max. According to the company their “finely jointed” and “highly adaptable” SKE50 automatic climbing formwork was ideal for inside the tower legs, where space was limited, and SKE100 with its high load-carrying capability was used on the Doka Monolithic is a monolithic formwork system for forming, casting and stripping wall and floor panels in a single operation. Contact Form; EN. The formwork inside the platform consists of 480 m 2 of Framax Xlife-panels, which stand out for their high number of re-use cycles and smooth concrete surfaces. Laden Sie sich die Broschüre kostenlos herunter und profitieren Sie von Doka is a world leader in providing innovative formwork, solutions and services in all areas of construction. com myDoka . All components must be stored safely, following all the special Doka instructions given in the relevant sections of this document! Maintenance Only original Doka components may be used as L&T-Formwork Marketing, Mount Poonamallee Road, Manapakkam, P. D Supporting head H20 DF. M +351 91 999 07 12. Doka system components are designed for long lifespan, maximum efficiency and the utmost workplace safety. Custom formwork and on-site assembly To complement its system formwork range, Doka offers customised formwork units. 1x60mm. The company is also a global supplier of well-thought-out scaffolding solutions for a varied spectrum of System components - Formwork. Mount the formwork sheets Decide how the sheets are to be arranged. The bridge between knowledge and experience - our expertise spans a broad spectrum. Nail the sheets to the secondary beams with ring nails 3. For more information, please contact your Doka techni-cian. Over-high When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. User Information Floor props Eurex top. 0m Standards onto each base Collar and Jack and assemble the Ledgers and Transoms for Lace the Base Collars over the Base Jack. E Doka floor props Eurex. due to high load capacity and easy handling. M 145 KN. Product Information Formwork-sheet stop for panel assembly of the timber-beam formwork. You can choose from formwork systems and components for any construction The Doka composite forming carriage makes for fast, safe construction of bridges on which a concrete deck slab is joined to a steel superstructure. DokaCAD for Revit can help optimise safety, time and costs, as well as assembly and deployment plans for formwork elements. formwork assemblies for specialized applications. 4 999762014 - 05/2018 Doka is a world leader in providing innovative formwork, solutions and services in all areas of construction. The company is also a global supplier of well-thought-out scaffolding solutions for a varied spectrum of applications. Doka USA. Š by Doka GmbH, A-3300 8 Doka formwork sheet 3-SO 9 Formwork sheet 3S basic 10 Formwork sheet 3S top 11 Formwork sheet 3S cut 12 Doka formwork sheet FF20 14 Three-ply sheet without coating 15 Multi-ply formwork sheets Instructions for Assembly and Use, Operating Instruction manuals, plans etc. Nuno Rego. 9756-201-01 9756-206-01 WARNING Risk of formwork beams tipping over! Doka offers special tools that help you in designing transparent processes. (A) Plumbing strut 540 IB with strut shoe EB. This includes technical support such as assembly Doka delivers solutions. Dependable form-ties and safe suspension points are crucial for efficient and safe usage of any formwork. Every year, Doka Amstetten produces about 25,000 m² User Information Climbing formwork 150F Assembly Mounting the formwork Timber-beam formwork NOTICE It is not permitted to locate Multi-purpose wal- e. Doka FRAMAX Xlife. —Rigid connection with leveling locks: up to 40 m2 of formwork assembly – can be moved using a crane. A Utilisation factor. Framed formwork Frami Xlife User Information Instructions for assembly and use (Method statement) 98030-337-01. for modern-day bridge -building. All components must be stored safely, following all the special Doka instructions given in the relevant sections of this document! Maintenance Only original Doka components may be used as 32 Ladder system XS on Doka column formwork platform 150/90cm 35 General 35 Transporting, stacking and storing 40 Article list. H-BEAM THE CORE SYSTEM H-16 6 KN 3 KN. Doka engineers prepare and communicate all the knowledge needed for a successful project. František Madleňák frantisek. In addition, the User Information booklets (Instructions for Assembly and Use), which contain information on standard system set-up and on compliant utilisation of Doka formwork systems, must also be observed. The travelling composite forming carriage carries a large area of pre-assembled composite bridge-deck formwork that can be cycled without being dismantled. Our specialists draw up assembly and erection plans to suit your specific requirements and preferences. madlenak@doka. The complete system can be assembled and repositioned by hand thanks to the use of lightweight aluminium panels. M2 Doka planning service Doka will be pleased to plan an economical form- work solution for you, and partial pre-assembly of the formwork by the Doka Ready-to-Use Service will save both man-hours and space on the site. piecelists for Doka items and consumables including necessary information on materials. You can choose from formwork systems and components for any construction project and any requirement. – The increased bending strength of the steel profile of the frame, withstands the pressure of the concrete mixture up to 60-80 situation during formwork assembly and are All persons working with the product described therefore not always complete from the safety herein must be familiar with the contents of this point of view. This is the way to speed up pouring processes, optimise inventories and create more efficient formwork planning processes. com. 999801702 - 06/2017. Doka offers systems & components for all areas of construction activity – for anything from housing developments to transportation infrastructure and power-generation facilities, or for building the world’s tallest structures. 7. For both wall formwork, single-sided formwork and climbing formwork, a complete range of field-proven form-tie solutions and suspension points is available. 70m A pre-assembled, foldable, ready-to-use platform, 1. ) are up to date and 2 marks = 8'-0" maximum spacing of stringers. M2 350 KN. 8. Doka announced its latest news during CONEXPO 2023 - visitors are able to experience hands-on wall and slab formwork, safety, scaffolding, and Safe tying and anchoring technology for all formwork tasks. g. formwork the Doka slinging means stated in this booklet must be used – this is a mandatory require-ment. Delivering form solutions for all construction needs. The Composite formwork beam I tec 20 is a solid- web beam pursuant to DIBT (German Institute of Building Technology) building-industry approval with a Doka offers formwork solutionsfor all areas of construction activity – for anything from housing developments to transportation infrastructure and power-generation facilities, or Instructions for assembly and use (Method statement) by Doka GmbH, A-3300 Amstetten 9747-216-01 Contents Introduction Elementary safety warnings User target groups When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. Technical Information Can be used with following systems Column formwork Top 50 the constant Contact Doka headquarters or find your local office address and contact details here. The Facility Turning Challenges into Achievements 2 3. Wall, Slab, Climbing, Shoring, Safety and Components. PT; ES; Austria; Belgium; We, Doka GmbH, use cookies and third-party applications. Column formwork KS Xlife User Information Instructions for assembly and use (Method statement) When lifting formwork or formwork accessories with a crane, no persons must be carried along, e. 00m. Product description Doka floor props Eurex top are extendable floor props made of steel and are Quick set-up. This optimizes the use of Doka formwork systems provided and helps ensure your success on site. 50m and assembling tool from ground level The DekLift may only be used for easier handling of sin-gle Dokadek panels during formwork set-up and removal, especially on larger room heights. Tip: Easy set-up with Docking head. required sizes, check sizes and labelling including elevations and details. All components must be Formwork-sheet stop for panel assembly of the timber-beam formwork. Roughly adjust the height of the floor prop, using the formwork 58 Gang assembly 65 Doka Pre-assembly Service 66 Structural design 66 Doka beams H20 67 Top 50 gangs 73 Struts 75 General remarks 75 Top 50 combined with . Nuno. because of concealed threads. M H-20 11 KN 5 KN. High safety. com +43 664 88384341. User Information Ringlock Aluminium Stair Tower Erection Guidelines (4-Leg) Step 1 Step 3 Refer to notes on safe use of Ringlock Stair Towers. Doka field service Our supervising foremen and engineers will advise you right the way through from when the formwork is In diesem Dokument finden Sie Informationen über die Schalungslösungen von Doka für den Hochbau, den Ingenieurbau, den Tunnelbau und den Industriebau. system ( formwork plus traveller) that meets the most stringent. Lay the formwork sheets and pull them tight with the Strip tensioner B 5. The protection screen can be dimensioned very flexibly, permitting last-centimetre adjustment to any shape of layout. Note: This document is only valid in combination with the fol-lowing underlying document: 'Large-area formwork Top 50' User Information booklet. Sharpen your competitive edge by using high-performance Doka forms. Doka‘s modular system, based on its decades-long experience of widely differing construction tasks, means that it can deliver the right climbing formwork Solutions for your construction projects. Dokaflex is the fast, versatile floor-slab formwork for any desired deck layout. All gaps are closed off to prevent any tools or other small items being dropped Indiabulls benefits also from the assurance and reliability, maximum safety, time efficiency of fast assembly, and full technical support from engineering staff round the clock.